Campus Upgrades & Additions

Summer 2025

The Lebanon Valley College campus will hum this summer, as extensive upgrades and additions will be made to academic, athletic, residential, and social spaces to enhance the student experience and help you Achieve More than you ever thought possible!

Mund College Center exterior

Academic and Social Spaces

Allan W. Mund College Center—LVC’s social, retail, and dining hub.

  • A new multi-use space, including expansion of the Commuter Lounge area
  • Additional study rooms in the Center for Academic Success and Exploratory Majors
  • A new Community and Belonging Lounge on the main floor
  • Refresh of the LVC Gear Shop

Neidig-Garber Science Center *

  • Creation of an Engineering Physics teaching lab
  • A new faculty research lab

Bertha Brossman Blair Music Center

  • Upgrades to the primary elevator used to move instruments and equipment for Marching Band and other large ensembles.
Aerial image of LVC football field and track

Athletics

Henry and Gladys Arnold Field +

  • Installation of new state-of-the-art multi-use FieldTurf System
  • Home to Football, Field Hockey, Men’s Lacrosse, and Women’s Lacrosse

Arnold Field Track

  • Installation of new Mondo Track Surface, which was used in the most recent Olympics
  • Training and competition for Men’s & Women’s Track & Field teams
  • Benefits Cheerleading and Pride of The Valley Marching Band

LVC Softball Park **

  • Upgrades to field, including the program’s first press box
  • New infield material to level playing surfaces
  • New sound system

Herbert Field ++

  • Installation of new scoreboard
  • Sound system enhancements
  • Home to LVC Men’s and Women’s Soccer

Shankroff Tennis Center #

  • Installation of the program’s first camera system as part of technology enhancements
  • Home to LVC Men’s and Women’s Tennis

McGill Field

  • Regrading of field plus addition of new infield material
  • Home to Dutchmen Baseball
Decorated room in Keister Hall

Residential

Hammond and Keister Halls 

  • Air Conditioning (AC) Installation, the final two residence halls to be air-conditioned
  • Conversion to Heat Pump System from Electric Heat to improve efficiency
  • New flooring and window roller shades for all rooms
  • New hallway flooring

Thank you to the LVC alumni, family, and friends who have made these upgrades and additions possible with their generosity.

* Dr. Elizabeth Miller Bains ’64 and Dr. James A. Bains Jr.

+ Tracey ’91 and David ’91 Stover

** Melissa ’05 and Kevin ’05, M’09 Poole

++ Ryan Tweedie ’93 and Shana Barnes, and Jeff Burt ’93 and Kathleen “Kathy” Wolfe Burt ’94

# Benjamin Shankroff